5-10-2008 Undeveloped lot

5-21-2008 Clearing the lot

6-27-2008 Clearing the lot

7-3-2008 Cleared lot

10-6-2008 Digging retention pond

3-12-2009 Construction Sign

3-20-2009 Groundbreaking Ceremony: Presentation of the USDA Check

3-20-2009 Groundbreaking Ceremony

4-7-09

5-15-2009 Pouring Concrete

5-15-2009 Pouring Concrete

6-8-2009 Steel Frame Construction

6-8-2009 Steel Frame Construction

6-22-2009 Steel Frame Construction

6-22-2009 Steel Frame Construction

6-22-2009 Steel Frame Construction

7-14-2009 Insulation Installation

7-14-2009 Insulation Installation

7/17/2009 Roof Construction

8/24/2009 Installing the Brick

8/24/2009

9/4/2009 Fire Bay Entrance

9/4/2009 Interior Hallway

10/12/2009 Interior Hallway

10/12/2009

10/12/2009

10/12/2009
|